Power capacity

  • >100 MW to be verified
  • 132 kV Voltage
  • N-1 redundant

Grid

  • ~6-7% marginal rate loss percentage (2016–2017)
  • ~1.0 km grid line to main transformer station
  • Redundant grid point

Area size

  • Today ~13 ha = 130,000 m2
  • ~8.2 ha zoned industry => flat area
  • Additional potential of ~102 daa => fairly flat forest area including a gravel pit
  • No large settlement next to site

Fiber

  • Fiber access 
  • Several operators

Time to market

  • 2019. Dependent on transformer solution and final approval from Statnett/NVE and road authorities

Infrastructure

  • 30 min to Evenes international airport
  • 30 min to Nordkraft HQ / Narvik

Climate

  • Average yearly temperature = ~2.9 celcius (Bjerkvik)