Power capacity

  • ~100 MW to be verified
  • 132 kV Voltage (2 free voltage fields)
  • N-1 redundant

Grid

  • ~8-9 % marginal rate loss percentage (2016–2017)
  • ~1.5 km grid line to main transformer station
  • Redundant grid point (2 lines to Bardufoss)

Area

  • Today ~11 ha = 110,000 m2
  • Zoning started
  • Flat forest area 
  • No large settlement next to site

Fiber

  • Fiber access 
  • Several operators (BBFT, Broadnet, Telenor and Statnett)

Time to market

  • 2020. Dependent on transformer solution and final approval from Statnett/NVE.

Infrastructure

  • 40 min to Bardufoss airport (primary)
  • 90 min to Nordkraft HQ / Narvik

Climate

  • Average yearly temperature = ~2,2 celcius (Setermoen)