Power capacity

  • 100 MW+
  • 132 kV Voltage
  • Renewable energy supply

Grid

  • ~6-7 % marginal rate loss percentage (2016–2017)
  • ~1.0 km grid line to main transformer station
  • Redundant grid point (8 power lines)

Area size

  • Today ~17 ha = 170,000 m2
  • ~9 ha zoned industry => flat area
  • Additional potential of ~8 ha => fairly flat forest area including a gravel pit
  • No large settlement next to site

Fiber

  • Redundant fiber access with international dark fiber
  • Several operators

Time to market

  • Q1 2020
  • Dependent on final approval from Statnett/NVE and road authorities

Infrastructure

  • 30 min to Evenes international airport
  • 12 min to Nordkraft HQ / Narvik

Climate

  • Average yearly temperature = ~2.9 celcius (Bjerkvik)