Narvik: Kvandal
The site is located in Bjerkvik, Narvik municipality. The location close to one of the largest central grid transformers in Northern Norway provides high capacity and reliability on power supply.
Power capacity
- 130 MW (n-1) and 100 MW (n-0)
- 132 kV Voltage
- Renewable energy supply
Grid
- ~6-7 % marginal loss factor (2016–2017)
- ~1.0 km grid line to main transformer station
- Redundant grid point (8 power lines)
Area size
- Today ~25 ha = 250,000 m2
- Zoned
- Fairly flat area including a gravel pit
- No large settlement next to site
Time to market
- Market ready
Infrastructure
- 30 min to Evenes international airport
- 12 min to Nordkraft HQ / Narvik
Fiber
- Redundant fiber access with international dark fiber
- Several operators
Climate
- Average yearly temperature = ~2.9 celcius (Bjerkvik)